Interior Logic Group
Carpenter · Indianapolis, AZ
DIRT Score Breakdown
78 reviewsView on Google →
DIRT Score = confidence-weighted rating across verified review platforms. How is this calculated? →
What Customers Say
“0 stars if I could! Our builder went with ILG and have been waiting on cabinet parts since September 2022. They installed random pieces to hold us over that aren’t the same color, some of them are even damaged. They also installed the wrong configuration in my primary bathroom and we told them this September 4th, 2022 and because of their turnover they’re saying they are just hearing about this over 7 months later. Obviously there are serious issues in communication within this company. If I was the builder I would be seeking terminations in warranty contracts, barring them from future business, and seeking damages. This is ridiculous waiting over 7 months for cabinet pieces.”
“I bought a new house with Richmond Homes and they contracted this company to replace my tiles. Their worker, Daryl, who was in charge of the work being done at my house, does not care for proper communication between them and their clients nor the care to fix what mess and damages they made when working. I was instructed by Richmond that Daryl was to call me 1 week prior to us having to be out of the house and give us a check for the hotel and meals, then another which covered our per diem costs and to tell us if they would be booking the hotel for us or we had to book it ourselves, as well as the process of what they would be doing, how long it would take, and when we could come back. This way if we had to book the hotel, we had enough time to look at hotels and see which had room availab”
“Worst experience of my life. If you're building a home and the contractor uses Interior Logic (Capstone Homes, Toll Brothers and others), find another builder. I paid top dollar for upgraded cabinets, closed on the house 7 months ago, and i still don't have working / functioning cabinets. Countless phone calls, text messages, emails and time spent trying to get it done- no luck. I'll be filing a complaint with the Arizona Registrar of Contractors, and will likely hire someone else to complete the work.”
“By far the worst experience I have ever had with a company. They have the worst communication. They no showed THREE separate times after rearranging MY FAMILIES schedules to be available. They have shown up TWICE with the wrong part. The picture attached is after they "fixed" my trash/recycling receptacle that had fallen off the tracks. This 5 minute job took an entire YEAR AND A HALF to get done. If it weren't for my builder (David Weekley) having a contract with this company, I would have found a new company after the first time they no showed. Absolutely horrible customer service. I would be embarrassed to work for this company. DO NOT USE THEM FOR ANY TYPE OF WORK!”
“We have been waiting over 2.5 years for them to replace defective cabinets they installed in our home. Their workers drilled holes wrong and instead of disclosing it, they tried to cover it up. They also put a warped piece of backing on our kitchen island, never anchored it and installed cracked drawer faces. They came out to “color match” 7 months ago and will not return calls or emails. They also installed our shower tiles wrong and told us it would take 3 days to replace. It took over a month and they blew demo dust all over our matte black bedroom. Horrible company, horrible customer service. DO NOT USE.”
“I would give them zero stars if I could. Just like everyone else says, they are completely garbage! Unfortunately our builder used them for our tile in our new home and a 5 year old can do a better job then they did. A year and a half later and here we are just trying to get it fixed. 54 tiles need to be replaced and the grout throughout the entire house is crap and needs replaced. Why are builders still used the piece of crap company.”
“Horrible customer service and workmanship, I would give 0 stars if that was possible. My builder used Interior Logic to do the flooring installation. The tile was installed completely uneven, after fighting for 10 months to get it fixed, they finally move me out of the house for 3 days only for them to not have ordered enough tile to complete the job. Leaving me with no flooring in several sections of the home for a month. They were scheduled today to finish the remaining demo and install only for them to not show up.”
“Zero stars are deserved for this company. My builder unfortunately chose this subpar contractor for my tile work. I've now been going back and forth for over 5 months on this issue. They've done the same inspection 3 times before finally agreeing to replace a shower pan. They came out today to do the repair and instead of replacing the shower pan, they decided to replace the grout on the bench. Run from this company!”
“Stay away from this company. Our builder used this company for the tile in our new home. During our 1 year inspection we found soft grout and hollow tiles. They were no show/no call on 4 different occasions. When they finally did come the first time they only replaced a handful of tiles. They then discovered that there were more to be replaced and they needed to come back out once they ordered more tile. They left an absolute mess of dust in our kitchen. They came back out a month later and replaced something like 58 more tiles. It has been 6 or 8 months and we keep finding more hollow tiles. How this company is still in business is beyond me.”
“Unfortunately I have no control in choosing this company to fix my hollow and loose tile, as Pulte has a contract with them. I hope Pulte strongly reconsiders their contract. Since June of this year, this company has wasted my time on 5 different occasions. You read that right folks. 5. First time they completely no showed & then later said they had a last minute meeting that ran over. 2nd time a tech came out to “evaluate” tiles. I was under the expectation they were going to actually fix them. Tech ended up finding about 16 tiles that needed to be fixed. 3rd time they sent another tech out to evaluate & I informed them someone had already done that. This tech ended up finding 23 tiles that needed to be fixed. 4th time, it was confirmed this company had ordered the tile & grout to complet”
Last updated: