Abilene Concrete Contractor
Foundation Contractor · Abilene, TX
About
Abilene Concrete Contractor handles foundation and concrete work from their spot at 2310 Maple St in Abilene, Texas. They take on driveways, patios, foundations, sidewalks, garage floors, stamped concrete, retaining walls, pool decks, steps, slab foundations, footings, parking lots, and cutting jobs. The business lists service areas that reach San Angelo, Midland, Odessa, Wichita Falls, Lubbock, Brownwood, Stephenville, Weatherford, Killeen, Temple, and Waco. They keep hours from 8 AM to 8 PM Monday through Saturday and 8 AM to 5 PM on Sunday, with contact at (325) 283-1250 or team@concretecontractorabilenetexas.com.
Homeowners have described driveway pours where the crew arrived right on the scheduled time, cut the joints, and left the invoice matching the original quote. One project built a new sidewalk from an existing driveway out to a side gate that came out neat and solid. Another job put in a backyard patio over two days with the crew keeping a steady pace and shifting the layout just enough to keep rainwater from pooling near the house.
The same customers noted the front contact person stayed in touch throughout and fielded questions without issue. The crew showed up when promised and stuck to the quoted numbers on the driveway job. Work covered the full list of services across the listed towns and cities, with the business open every day including weekends.
Three reviews sit at five stars each. The main points that come up are crews showing up on time, clear updates during the job, and small layout tweaks that fixed drainage.
Service Areas
DIRT Score Breakdown
5 reviewsView on Google →
DIRT Score = confidence-weighted rating across verified review platforms. How is this calculated? →
What Customers Say
“Scheduled for 7:00, they rolled up at 7:00 sharp! Driveway poured, joints cut, invoice as quoted. Abilene Concrete Contractor.”
“Out of all the companies I talked to, Abilene Concrete Contractor was the easiest to deal with. They built a new sidewalk from the driveway to the side gate and it came out neat and solid. The guy at the front kept me updated and answered all my dumb questions without acting annoyed.”
“Backyard patio project took about two days start to finish. The crew worked steady and didn’t waste time. They even adjusted the layout slightly so rainwater wouldn’t collect near the house. That detail mattered to me.”
Last updated: