About

Ghilotti Construction Company works as a general contractor from Santa Rosa, California, at 246 Ghilotti Ave. They take on asphalt paving, road construction, excavating, utility work, site development, and underground structures. The outfit lists itself under multiple categories including civil engineering and paving, and it covers transportation projects plus self-perform tasks in the northern California region.

Customers describe repeated problems during sidewalk and street paving jobs where crews block driveways for days without finishing the work. Reviewers name issues like night crews arriving late and making noise with truck doors, backup alarms, and idling engines that disturb sleep. Others mention flaggers who let one line of traffic sit for fifteen minutes or more while sending the other side through unevenly, plus metal plates over holes that bounce and clatter under cars all night long.

The crew handles large highway and local road projects that often stretch past the original timeline. Reviewers note that trucks get parked in front of homes or across driveways even when work is not happening nearby, and some describe calls to the office going unanswered or met with rude responses from the front desk. Service reaches spots in Sonoma and Marin counties, with projects that include repaving freeways and handling underground utility lines.

The Google rating stands at 2.8 from the listed reviews. Common topics include slow progress, traffic control failures, budget overruns on long-running jobs, and drivers or crews showing little regard for nearby residents or pedestrians.

DIRT Score Breakdown

Google

50 reviewsView on Google →

2.8

DIRT Score = confidence-weighted rating across verified review platforms. How is this calculated? →

What Customers Say

“I understand road construction is necessary, but Ghilotti Construction's handling of this project has shown very little consideration for the residents who have to live next to it. For the past several weeks, construction vehicles and equipment have been parked in front of my home, effectively turning a residential street into a staging area. The noise has been excessive and disruptive. Crews routinely arrive between 8:00 PM and 10:00 PM to begin night operations and return between 2:00 AM and 4:00 AM. The constant slamming of truck doors, backup alarms, engines idling, equipment movement, and loud conversations have repeatedly disturbed our sleep. Because my home sits uphill from the roadway, the noise is amplified throughout the property. Equally concerning is the apparent disregard for public safety. Construction vehicles have repeatedly blocked one lane of a two-lane road during peak morning commute hours, creating traffic backups and several near-collision situations. Residents should not have to navigate hazardous traffic conditions simply because proper traffic control measures were not implemented. What has been most disappointing is the lack of communication and considerat”

Jonathon Parvu

“First, with all of these low ratings I am surprised that this place is still in business. And after my experience today, I am not sure that they should be. They have been working on our sidewalk for a few months now, and over a 3 day period we were blocked out of our driveway. We were given a notice prior to that closure so that we could find somewhere else to park. This morning (8/24/2026) at around 10am, we needed to gas up our car so that we could take our soon to a dental appointment in a city about an hour and a half away. As we prepare to pull out, there is about a two foot hole between our driveway and the road. They were pouring asphalt, but not yet close to our driveway. I told two of the workers that we really had to get out, as we have had this appointment for months. They were very nice and went to get their supervisor. Enter the problem. The supervisor (he is the guy in the foreground in the picture below) slowly walked up, sauntered around a bit, and then asked if we had ten minutes. I told him it looks like we have no choice, and why were we not given a letter like last time. He replied "Most people are gone by now". NO apology, just a snarky remark. I told him no”

Chris Nifong

“What absolute jerk these people are asked them very nicely not to park directly across from my driveway. They threw a fit and then tried to man. Explain to me why they were parking there. They’re not even working anywhere near my home, but this is an easier spot for somebody who doesn’t know how to back up a trailer to park one I offered to move it so that it could be. Another location, he laughed and told me that women can’t drive trucks are parked trailers A bunch of jerks”

Glonda Courtney

“These people are probably good at building roads but they are very toxic to the pedestrians that have to use the sidewalks here in Vallejo ca fairgrounds dr they do not post adequate signs when there working it’s very dangerous for pedestrians.My experience today 2/06/2026 as I was using the crosswalk by the underpass near marine world and the country club crest there were workers from ghilotti parked half on the side walk and street with thick tree on one side and no room and cars on the other side.I had to go on the side with the tree and doing so scuffed my clothes proper precautions needs to be taken”

Omar jones

“Most unprofessional and unreliable company I’ve experienced. (I didn’t hire them) They are supposed to be paving my street. Weeks and weeks asking us to find somewhere else to park (hundreds of tenants) And they don’t even show up for the scheduled project. Towing cars, and inconveniencing everyone! Ghilatti, please get it together and be more professional and organized please!”

Miley Alvarez

“I’m not sure if anyone ever answers the phone here, but I am writing to express extreme frustration. There has been an underground project continuing for a month or two longer than originally scheduled on Mission Blvd and Quigg Drive. There are metal plates covering large holes that are not placed quietly. Whenver any small or large car drives over the metal plates they bounce up and down. It sounds like bombs are going off all night as we’re trying to sleep. It’s insanely inconsiderate. If you read these reviews, have your team fix it! I’m reaching a boiling point in delirium. The City of Santa Rosa is next.”

Shane Solomon

“Very slow with their construction and doesn't keep it equal when letting cars go. And let's one side go and makes the other sit for over 15 minutes at a time and the other go and let all the cars go while the other side gets less than a quarter of the line go through. And their flaggers are very rude and disrespectful and don't know what they are doing. This is the 5th time this week this exact thing has happened and we moved for about 10 seconds and our line is already stopped and the other line is moving.”

Katrina Williams

“Milking the Novato Narrows Project for every dime for over 15 years now. How long could it possible take to ad a few lanes to a stretch of highway??”

Dick Harper

“About a year ago a careless driver from Ghilotti misjudged his moving into my lane, too close, nowhere for me to go and he caused over $4,000 worth of damage to my car- the drag was that Ghilotti didn't just own up right away even tho driver admitted immediately to he in the wrong! They fought it- and they Lost! Scumbags! MW”

Chris Wroth

“They do poor quality work, poor traffic control, and go over time and over budget. Even ChatGPT warns of this! Local governments, do not use!”

Josh

“They do not train employees to think of driver safety and a stop sign holder nearly caused 2 car accidents.”

Mary Gardner

“Ghilotti contruction,here to make sure your 5 min commutes a 30 min one everytime,HOORAY.”

Austin Hargreaves

“lady's at the front desk hangs up on you instantly. Rude as hell would not even recommend calling”

William Runs

“These incompetent workers almost caused a major accident pulling out in front of on coming traffic with no regard. How these people have jobs is a mystery to me. Karma will come back to these guys eventually.”

SunsolarelectricCA SunsolarelectricCA

“Can you speed up the construction in Petaluma please?”

Jacqui Lloyd

“Beautiful offices - dog-friendly too. The payroll department employees are friendly and very hard working!”

Sheri Shirey

“The receptionist is very unprofessional and very rude! Unreal working for a company answering phones when someone ask to speak to a owner how disrespectful she was!”

Deandre Stokes

“If you need a freeway repaved, this is the team to do it. 10/10 would recommend”

Nick Baker

“Underestimates job budgets to gain contract, raises prices in the middle of jobs.”

Bill Harris

“Large construction company in the sonoma Marin counties.”

michael noonan